Altera SoC Embedded Design Suite User Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 207
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
Cyclone V Device Handbook: Booting and Configuration
For more information about Booting and Configuration with regards to Preloader, refer to the Booting
and Configuration appendix in volume 3 of the Cyclone V Device Handbook.
Arria V Device Handbook: Booting and Configuration
For more information about Booting and Configuration with regards to Preloader, refer to the Booting
and Configuration appendix in volume 3 of the Arria V Device Handbook.
Getting Started with GCC Bare-Metal Project Management
This section presents a complete bare-metal example demonstrating the GCC bare-metal project
management features of the ARM DS-5 Altera Edition.
Start Eclipse
1. Start Eclipse
The Workspace Launcher dialog box appears.
Figure 4-4: Select a Workspace
2.
Select a new workspace to use. For example, you can enter c:\Workspace and click OK.
Create New Project
1. Go to File > New > Project...
4-6
Getting Started with GCC Bare-Metal Project Management
ug-1137
2014.12.15
Altera Corporation
Getting Started Guides
Send Feedback
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 206 207

Comments to this Manuals

No comments